Ameren Stats
Here is some of the information that Ameren handed out at last week meeting
More that 600 truck loads of Mulch has been given away
Two air curtain destructors are being used to burn woody debris
Over 2000 truck loads of silt have been removed
Over 1300 truck loads of woody debris have been removed from the campground and mulched or burned
Exposed rebar has been cut from concrete debris to make the work site safer
Campground area being prepared for seeding
Concept plans for river restoration ongoing. Plan to be presented at the March public meeting.
0 Comments:
Post a Comment
<< Home